ELECTRIFICATION/INSTALLATION OF 300KVA/11KVA/0.415V TRANSFORMER AT IGUOTOR COMMUNITY, OVIA N.E. L.G.A. EDO STATE.

CLIENT: Edo State Oil and Gas Producing Areas Development Commission (EDSOGPADEC)
PROJECT: Electrification and Installation of 300KVA/11KV/0.415V Transformer at Iguotor Community, Ovia North East L.G.A., Edo State

PROJECT LOCATION:
The project is located at Iguotor Community in Ovia North East Local Government Area, Edo State.

PROJECT DESCRIPTION:
The project involved the electrification of Iguotor Community through the installation and distribution of electrical infrastructure, including:

  • Installation of one (1) 300KVA/11KV/0.415V transformer.
  • Erection of 5 No. High Tension (HT) poles.
  • Erection of 27 No. Low Voltage (LV) poles for community-wide distribution.

PROJECT STATUS:
Completed – August 2024.